Timber Frame Drying for Pre-Line — Auckland
Pass pre-line with confidence. We install pro drying gear, monitor daily, and provide a council-ready moisture report at completion. Our team is IICRC-certified and available 24/7 for flood-related work.
Typical timeframe: 48–72 hours for standard builds (size and weather dependent).
Call/text 021-877-504 • Free delivery on hire gear • Auckland-wide
Why builders pick us
-
Outcome focused: We target council moisture thresholds and supply digital readings before, during, and after, plus a final report for your pre-line inspection. Free moisture testing is included with hire.
-
Certified team: IICRC-trained for water damage and structural drying—ideal if a leak or flood is involved.
-
Fast turnaround: Most frames dry within 48–72 hours with the right setup and containment.
-
Clear, builder-friendly pricing: Transparent day rates and free delivery.
Two ways to get it done
1) DIY Hire (most popular for builders)
Construction Drying Pack – Free Delivery
Large 90 L dehumidifier + 2 Fans + Moisture Test
$110 + GST per day
7-day: $400 + GST
Call Now: 021-877-504
🔥 Heavy Duty Construction Drying Pack – Free Delivery
Diesel Fan Heater + Large 90 L dehumidifier + Moisture Test
$140 + GST per day, 7-day: $500 + GST
📞 Call Now: 021-877-504
-
Extra carpet dryers / air movers: $35 + GST / day (free delivery).
-
Generator hire from $70 + GST / day (free delivery).
2) Full-Service Install & Monitoring
We handle everything: on-site assessment → equipment setup (containment, fans, dehumidifiers) → daily moisture readings and adjustments → decommission → final moisture report for pre-line. Ideal when timelines are tight or after leaks/floods.
What we use
-
LGR/Commercial dehumidifiers (90 L/day): Pulls bulk moisture out of framing efficiently.
-
Axial and centrifugal air movers: Push dry air through cavities and across studs for even results.
-
Desiccant units (as needed): For low-temperature or stubborn moisture scenarios.
The process (simple & documented)
-
Assess & plan — identify wet zones, choose the right kit, set targets.
-
Install — dehumidifiers and fans placed for even drying; containment if required.
-
Monitor daily — moisture readings logged; gear adjusted as needed.
-
Sign-off — final digital moisture report for your records and pre-line.
FAQs
How long will it take?
Most frames reach council moisture levels in 48–72 hours, depending on footprint, timber thickness, weather, and ventilation.
Do you provide evidence for the inspector?
Yes—daily logs and a final moisture report are included. Moisture testing is free with hire.
Can you help if a leak or flood caused the issue?
Absolutely. Our IICRC-certified restoration team can handle extraction, sanitising, and structural drying as well.
Ready to dry your frame?
Call or text 021-877-504 to book your 90 L dehumidifier + bonus fan at $75 + GST / day with free delivery.



